As the Equine Facility Infrastructure & Heavy Equipment Manager Fellow, you will oversee the structural integrity, heavy mechanical assets, utilities, and daily physical readiness of our comprehensive agricultural facility.
Phase 1: Grounds Operations & Basic Fleet Readiness (14% Total Weight)• Grounds Equipment Safety & Operation [3.0%]: Safely operate and direct usage of commercial walk-behind mowers, brush trimmers, leaf blowers, and specialized barn maintenance equipment.• UTV Operations & Daily Mission Support [3.0%]: Master terrain driving, daily walkarounds, load limits, and operational utilization of utility terrain vehicles (UTVs/Gators).• Basic Grounds Equipment Maintenance [3.0%]: Execute daily operator maintenance, blade sharpening, fuel/oil mixture management, air filter cleaning, and routine servicing.• Phase 1 Assessment: Groundskeeping Circuit [5.0%]: A timed, hands-on practical assessment demonstrating safe, methodical, and thorough paddock and perimeter grounds preparation.Phase 2: Heavy Equipment Operations & Towing Logistics (17% Total Weight)• Heavy Equipment Fundamentals: Utility Tractors [4.0%]: Master tractor safety interlocks, 3-point hitch attachment mechanisms, hydraulic lines, PTO engagement, and front-end loader bucket operations.• Heavy Equipment Fundamentals: Mini-Excavators [4.0%]: Master trenching procedures, pasture drainage grading, swing controls, bucket swaps, and slope stabilization protocols.• Towing Operations & Safety (Work Truck Fleet) [4.0%]: Perform rigorous pre-trip inspections, master bumper-pull and gooseneck hitching systems, and practice defensive towing techniques with heavy trailered equipment.• Phase 2 Assessment: Precision Trailer Obstacle Course [5.0%]: Practical demonstration assessing precision 90-degree backing, narrow gate clearance, and obstacle maneuvering under tight barnyard constraints.Phase 3: Farm Infrastructure & Physical Plant Systems (15% Total Weight)• Electric Fence Systems Architecture [3.0%]: Inspect and maintain energizers, grounding field arrays, voltage drop testing, and containment safety standards for equine herds.• Electric Fence Repair & Diagnostics [4.0%]: Troubleshoot electrical shorts, splice high-tensile wire, replace polymer tape lines, and reinstall broken insulators.• Hydration & Pasture Water Systems [3.0%]: Service, clean, insulate, and winterize automated stall waterers, pasture float-valve troughs, and main waterline delivery networks.• Phase 3 Assessment: Critical Infrastructure Field Repair [5.0%]: Timed simulation requiring rapid diagnosis and repair of a damaged fence breach and a ruptured high-pressure water valve.Phase 4: Equestrian Arena & Footing Dynamics (16% Total Weight)• Implement Attachment & Hydraulics (Arena Drags) [4.0%]: Align, attach, connect hydraulic scarifiers, and set mechanical depth stops on professional arena conditioning implements.• Equine Footing Science & Moisture Management [4.0%]: Analyze sand/fiber composition, test moisture retention, calibrate dust suppression irrigation, and execute pattern grooming to safeguard horse orthopedic health.• Round Pen & Training Enclosure Maintenance [3.0%]: Grade footing, stabilize retainers, and reinforce structural panels on lunging rings and round pens.• Phase 4 Assessment: Competition Arena Footing Certification [5.0%]: Independently inspect, moisture-condition, and groom the main indoor arena to meet strict competition standards.Phase 5: Advanced Fleet Maintenance & Preventive Maintenance (17% Total Weight)• Small Engine Diagnostic & Overhaul [4.0%]: Execute fluid flushes, spark plug gapping, valve clearance checks, and carburetor rebuilds/cleanings across facility small engines.• Fleet Towing & Trailer Preventative Maintenance [4.0%]: Pack trailer wheel bearings, inspect electric brakes and breakaway systems, rotate commercial-grade tires, and audit suspension integrity.• Heavy Equipment PM Schedules [4.0%]: Administer 50/100/250-hour preventive maintenance packages (fluids, hydraulic filters, chassis greasing) on tractors and other Kubota equipment.• Phase 5 Assessment: Trailer Electrical & Brake Harness Diagnostic [5.0%]: Trace, troubleshoot, rewire, and certify a malfunctioning 7-way round trailer electrical and brake control system.Phase 6: Strategic Asset Management & Capstone Project (21% Total Weight)• Strategic 12-Month Maintenance Planning [4.0%]: Develop a comprehensive annual preventive maintenance cycle for all fleet vehicles, implements, water networks, and structural assets.• Budgeting, Procurement & Spares Inventory [4.0%]: Establish a critical spare-parts bench-stock, implement minimum reorder thresholds, and negotiate vendor accounts for commercial hardware and lubricants.• Capital Improvement Capstone Proposal [5.0%]: Formulate an engineering and operational design proposal (e.g., pasture rotation perimeter design, automated drainage, or rainwater harvesting system).• Capstone Presentation & Executive Defense [10.0%]: Deliver a formal technical briefing and business case presentation directly to the facility ownership and executive team.